[UPDATE] TT8KO – Chad
OCTOBER 11, 2018
The inspection of the equipment by the national security police has been postponed until tomorrow. No time given. Equipment has been disconnected. The Head of the police himself is travelling with the President, and when they return from abroad tomorrow, the Head of police will check the equipment personally with his technicians. All papers are ok and issued by Ministry. Apart from that, all is ok here.
Until then I catch up with some sleep, it was a very intense first 24h completing the installation and being on the air same time with 2135 Qs. The hotel is really great, fantastic take-off. The beverage is also working very well. Yesterday the Mosley beam failed, but I replaced one inductor this morning.
I was running on the 40m dipole on 15m last 30 min yesterday. Fantastic signals from NA on 15 and 40m! Until then the log for the first 24h has been uploaded to Club Log.
Version traduite en Français via Google Translate
Le 11 Octobre 2018
[UPDATE] TT8KO – Chad
11 OCTOBRE 2018
L’inspection du matériel par la police de la sécurité nationale a été reportée à demain. Pas de temps donné. L’équipement a été déconnecté. Le chef de la police voyage lui-même avec le président. Quand ils rentreront de l’étranger demain, le chef de la police vérifiera personnellement le matériel avec ses techniciens. Tous les papiers sont ok et émis par le ministère. A part ça, tout va bien ici.
Jusque-là, je rattrapais un peu mon sommeil, c’était une première très intense journée avant de terminer l’installation et d’être sur les ondes en même temps avec 2135 Qs. L’hôtel est vraiment génial, décollage fantastique. La boisson fonctionne également très bien. Hier, le faisceau Mosley a échoué, mais j’ai remplacé un inducteur ce matin.
Je courais sur le dipôle de 40m sur 15m les 30 dernières minutes hier. Signaux fantastiques de NA sur 15 et 40m! Jusque-là, le journal de bord des premières 24 heures a été téléchargé dans le journal du club.